Digital Green STP

Your sewage treatment plant, on your phone.

A plant nobody watches is a plant that fails quietly. Every Sarvo Green STP is PLC-automated as standard, and can be delivered with cloud monitoring, mobile alarms and AI-assisted optimisation — so problems reach you before they reach the pollution control board.

< 5 min

Alarm to notification, by SMS, email and push

99%+

Typical uptime on remotely monitored plants

0

Site visits needed to check plant status

10–15%

Energy reduction from adaptive cycle control

Architecture

Four layers, from probe to prediction

L1

Field Layer

Flow, DO, pH, level, MLSS and energy instruments wired to a Siemens S7-1200 or Allen-Bradley PLC with a colour HMI. Everything the plant needs to run automatically, whether or not the internet is up.

L2

Communication Layer

Modbus TCP/IP and OPC UA on site; 4G cellular or WiFi to the cloud over MQTT. Store-and-forward buffering means no data is lost during an outage.

L3

Cloud Layer

Time-series storage of every process tag, 30 days on Smart and a full year on Smart+, with REST API access and export for consultants and pollution control board submissions.

L4

Analytics Layer

Trend analytics, energy per KL benchmarking, anomaly detection and — on Smart+ — AI-based failure prediction and automatic cycle optimisation against actual load.

Choose your tier

Basic, Smart, Smart+

Basic is included in every plant. Smart adds the cloud and your phone. Smart+ adds intelligence — prediction, optimisation and fleet benchmarking.

PLC ControlSame PLC + Ethernet module
HMI Touchscreen10-inch colour
Automatic Cycle ControlFull automatic operation
Communication4G cellular or WiFi
Cloud PlatformMQTT to cloud dashboard
User InterfaceWeb dashboard + mobile app
Data LoggingCloud: 30-day trend data
Alarm ManagementLocal + SMS / email alerts
Remote MonitoringMobile app + web dashboard
Remote ControlView only
Performance AnalyticsDaily / monthly auto reports
Predictive MaintenanceNot included
Automatic Cycle OptimizationNot included
Multi-Site Fleet ViewMultiple STPs in one dashboard
SCADA IntegrationModbus TCP/IP, OPC UA
Indicative Add-On Cost+8–12% of equipment cost

Full automation & monitoring comparison

FeatureBASICSMARTSMART+
PLC ControlSiemens S7-1200 / Allen-BradleySame PLC + Ethernet moduleSame + edge computing gateway
HMI Touchscreen7-inch colour10-inch colour10-inch colour
Automatic Cycle ControlFull automatic operationFull automatic operationFull automatic + adaptive
CommunicationLocal only4G cellular or WiFi4G + WiFi + optional Ethernet
Cloud PlatformMQTT to cloud dashboardMQTT + REST API + data lake
User InterfaceLocal HMI onlyWeb dashboard + mobile appFull mobile app + web portal + API
Data Logging30-day local bufferCloud: 30-day trend dataCloud: 1-year data + export
Alarm ManagementLocal hooter + HMILocal + SMS / email alertsSMS + email + push + escalation
Remote MonitoringNot includedMobile app + web dashboardMobile app + web dashboard
Remote ControlNoneView onlyFull remote parameter adjustment
Performance AnalyticsNot includedDaily / monthly auto reportsAI-powered trend analysis
Predictive MaintenanceNot includedNot includedAI-based failure prediction
Automatic Cycle OptimizationNot includedNot includedAI adjusts cycle to load
Multi-Site Fleet ViewNot includedMultiple STPs in one dashboardFleet management + benchmarking
SCADA IntegrationNot includedModbus TCP/IP, OPC UAModbus TCP/IP, OPC UA, MQTT
Indicative Add-On CostIncluded in base price+8–12% of equipment cost+15–20% of equipment cost

Instrumentation package by tier

SensorRange / TypeBASICSMARTSMART+Maintenance
Inlet Flow Meter0–10 m³/hr electromagneticOptionalIncludedIncludedAnnual calibration check
Outlet Flow Meter0–10 m³/hr electromagneticIncludedIncludedAnnual calibration check
Dissolved Oxygen (DO)0–20 mg/L opticalOptionalIncludedIncludedQuarterly cleaning, annual cap
pH Probe0–14 pHOptionalIncludedIncludedMonthly calibration
Level TransmittersUltrasonic / hydrostaticIncludedIncludedIncludedAnnual check
Energy Meter3-phase, kWh + power factorIncludedIncludedNone
MLSS / Turbidity0–20,000 mg/LOptionalIncludedMonthly cleaning
Blower Vibration / Run HoursCondition monitoringRun hours onlyRun hours + currentVibration + predictiveNone

AMC & lifecycle service tiers

FeatureBASICCOMPREHENSIVETOTAL CARE
Visits per Year4 (quarterly)12 (monthly)24 (bi-weekly) + on-call
ScopeInspection + reportingInspection + minor repairs + consumablesAll maintenance + repairs + spares
Consumables IncludedNoLubricants, filters, mediaAll consumables
Spare PartsCustomer buysMinor spares includedAll spares (excl. major equipment)
Emergency ResponseNext business daySame business day4-hour response (8am–8pm)
Remote MonitoringNoMonthly data reviewContinuous + alert response
Performance ReportingQuarterly summaryMonthly detailed reportMonthly + real-time dashboard
Sludge ManagementNot includedCoordination onlyFully included
Indicative Cost (% of CAPEX/yr)2–3%4–6%7–10%

Project journey

From first call to signed handover

  1. 01

    Site Survey & Assessment

    1–2 days

    Sarvo engineer assesses sewage generation, available space, inlet connection, power supply, outlet options, reuse requirements and regulatory position.

    What you do

    Provide access, water consumption data, building plans

  2. 02

    Design & Proposal

    3–5 days

    Technology recommendation, model selection, site-specific GA drawing, performance guarantee, pricing and AMC options in a detailed technical proposal.

    What you do

    Review, ask questions, approve

  3. 03

    Order & Engineering

    2–4 weeks

    Detailed engineering, equipment procurement, civil drawings issued, PLC program developed.

    What you do

    Arrange civil contractor (we guide specifications)

  4. 04

    Manufacturing & Delivery

    3–6 weeks

    Equipment manufactured and assembled, Factory Acceptance Test, delivery to site.

    What you do

    Ensure site readiness per our checklist

  5. 05

    Installation & Commissioning

    3–5 weeks

    Installation, piping, electrical, PLC programming, instrument calibration, hydrostatic and integrated system tests, biological seeding, gradual loading.

    What you do

    Provide power, water, operator for training

  6. 06

    Performance Test & Handover

    1 week + handover

    Three consecutive daily samples tested at an NABL-accredited lab against the performance guarantee. O&M manual, operator training, formal handover, AMC begins.

    What you do

    Witness testing, assign operator, sign handover

See a live Smart+ dashboard

Book a 20-minute walkthrough of the monitoring platform with a Sarvo engineer, using data from a running plant.

Chat with us on WhatsApp